Javad Rezaeian
Javad Rezaeian

Javad Rezaeian

Email:  j.rezaeian[at]ustmb.ac.ir
Degree: Associate Professor
  • Bachelor of Engineering (B.E.) (Industrial Engineering), Yazd University, Yazd, Iran. (2003)
  • Master of Technology (M.Tech.) (Industrial Engineering), Mazandaran University of Science and Technology, Babol, Iran. (2005)
  • Doctor of Philosophy (Ph.D.) (Production Engineering), Mazandaran University of Science and Technology, Babol, Iran. (2011)
 
Qualifications
  • Bachelor of Engineering (B.E.) (Industrial Engineering), Yazd University, Yazd, Iran. (2003)
  • Master of Technology (M.Tech.) (Industrial Engineering), Mazandaran University of Science and Technology, Babol, Iran. (2005)
  • Doctor of Philosophy (Ph.D.) (Production Engineering), Mazandaran University of Science and Technology, Babol, Iran. (2011)
 
Research Interests

·  Project Management

·  Artificial Intelligence and Meta-Heuristic Algorithms

·  Design of Logistic Systems

·  Warehouse System Designing

·  Inventory Management

·  Production Planning & Scheduling Models

 
Honors and Awards

Top Researcher of University 2015

Prominent author of Iranian student book festival 2015

Top Researcher of Universities of Mazandaran province 2017

Top Researcher of Universities of Babol City 2020

 

 
Previous and Present Positions

2006 – SINCE NOW – Faculty of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran.

2005-2007 President of the Association efficiency of Mazandaran province

2013 – Head of the office of industrial relations, Mazandaran University of Science and Technology, Babol, Iran.

2015 – Head, Department of Industrial Engineering, Mazandaran University of Science and Technology, Babol, Iran.

2017- Vice chancellor for Education, Mazndaran University of Science and Technology, Babol, Iran.

 
Professional Membership

Editorial Board's Member of the Journal of Current Chinese Science. 

 

Editorial Board's Member of Archives of Industrial Engineering Journal.

 

Editorial Board's Member of journal of Artificial Intelligence Evolution.

 

Editorial Board's Member of Journal of Food Science and Engineering

 

Editorial Board's Member of Computer Science and Information Technology

 

Editorial Board's Member of American Journal of Traffic and Transportation Engineering 

 

Editorial Board's Member of The Journal of Educational and Management Studies

 

Scientific secretary of international conference on management, industrial engineering, economics and accounting.

 
Teaching Experiences

For Graduate students in Industrial Engineering

  • Meta-heuristic Algorithms
  • Production Management
  • Sequencing and Scheduling
  • Analysis of Logistics
  • production Planning

For Doctoral students in Industrial Engineering

Artificial Intelligence,

 
Publications
Journal Papers:

1. A set partitioning based heuristic procedure for incremental cell formation with routing flexibility, International Journal of Production Research, Mahdavi, I., Rezaeian, J., Shanker, K., Raftani Amiri, Z., Vol. 44, 5343-5361, 2006.

2. A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system, Rezaeian, J., Javadian, N., Tavakkoli-Moghaddam, R., Jolai, F., Applied Soft Computing, Vol. 11, 4195-4202, 2011.

3. Multi-objective cellular manufacturing system under machines with different life-cycle using genetic algorithm, Javadian, N., Rezaeian, J., Maali, Y., International Journal of Applied Science, engineering and Technology, Vol. 4, 223-227, 2008.

4. Designing an Incremental Cellular Manufacturing System Based on Heuristic Methods, Rezaeian, J., Javadian, N., LATEST TRENDS on COMPUTERS (Volume II), 539-545, 2010.

5. Application of genetic algorithm for designing cellular manufacturing system incrementally, WSEAS TRANSACTIONS on COMPUTERS, Rezaeian, J., Javadian, N., Tavakkoli-Moghaddam, R., Vol. 9, 1108-1112, 2010.

6. A multi-objective integrated cellular manufacturing systems design with dynamic system reconfiguration, Javadian, N., Aghajani, A., Rezaeian, J., Ghaneian, M-J., International Journal of Advanced Manufacturing Technology, Vol. 56, 307-317, 2011.

7. Single Machine Preemptive Scheduling by Hybridized Meta-Heuristic Approach, Javadian, N., Rezaeian, J., Khorshidian, H., Rahmani, K.,  IEEE, 750-753, 2011.

8. A genetic algorithm for JIT single machine scheduling with preemption and machine idle time, Khorshidian, H., Javadian, N., Zandieh, M., Rezaeian, J., Rahmani, K.,  Expert Systems with Applications, Vol. 38, 7911-7918, 2011.

9. Using a Hybrid Simulated Annealing and Genetic Algorithms for Non Fixed Destination Multi-depot Multiple Traveling Salesmen Problem with Time Window and Waiting Penalty, Shirafkan, M., Seidgar, H., Rezaeian, J., Javadian, N., The Journal of Mathematics and Computer Science, Vol. 4, 428-435, 2012.

10. The Mediating Role of Job Satisfaction between Spiritual Intelligence and Organizational Commitment, Cherati, H., Mahdavi, I., Rezaeian, J.,International Journal of Research in Organizational Behavior and Human Resource Management, Vol. 1, 1-11, 2013.

11. Scheduling of a hybrid flow shop with multiprocessor tasks by a hybrid approach based on genetic and imperialist competitive algorithms, Rezaeian, J., Seidgar, H., Kiani, M., Journal of Optimization in Industrial Engineering, Vol. 13, 1-11, 2013.

12. Stock Portfolio Selection Using a Hybrid Fuzzy Approach: A Case Study in Tehran Stock Exchange, Rezaeian, J., Akbari, F., International Journal of Operational Research, In press.

13. A Hybrid method based on AHP and TOPSIS with Uncertain data for MAGDM problem, Zarouk, Y., Javadian, N., Rezaeian, J., International Journal of  Industrial and Systems Engineering, Press.

14. Using a meta-heuristic algorithm for solving the multi-mode resource-constrained project scheduling problem (MRCPSP), Rezaeian, J., Soleimani, F., Mohasel Afshari, S., Arab, A., International Journal of Operational Research, In Press.

15. A hybrid multi-objective approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system, Rezaeian, J., Javadian, N., Tavakkoli-Moghaddam, R., Jolai, F., Computers & Industrial Engineering, Vol. 66, 1004-1014, 2013.

16. GIS-based frequency ratio and index of entropy models for landslide susceptibility assessment in the Caspian forest, northern Iran. Jaafari, A., Najafi, A., Pourghasemi, H. R., Rezaeian, J., Sattarian, A., Int. J. Environ. Sci. Technol, In Press. (2014)

17. Efficiency evaluation of Mazandaran industrial parks by using neuro-DEA approach, Sharifi, M., Rezaeian, J., International Journal of Industrial and Systems Engineering, In Press. (2014)

18. Meta heuristic for minimizing makespan in a flow-line manufacturing cell with sequence Dependent family setup times, Nikjo, B., Rezaeian, J., Journal of Optimization in Industrial Engineering, In Press. (2014)

19. Modeling erosion and sediment delivery from unpaved roads in the north mountainous forest of Iran, Jaafari, A., Najafi, A., Rezaeian, J., A, Sattarian., Int J Geomath, In Press. (2014)

20. Minimization of Makespan for the single Batch-Processing Machine scheduling problem with considering Aging Effect and Multi-Maintenance Activities, zarook, Y., Rezaeian, J., Tavakkoli-Moghaddam, R., Mahdavi, I., Javadian, N., International Journal of Advanced Manufacturing Technology, In Press. (2014)

21. Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility restrictions, Rambod, Mahdi., Rezaeian, J., Computers and Industrial Engineering, In Press. (2014)

22. JIT scheduling problem on flexible flowshop with machine break down, machine eligibility and setup times, Nasim Bilchi Kangarloo, Javad Rezaeian, Xaniar Khosravi, The Journal of Mathematics and Computer Science, In Press. (2014)

23. Development of permutation method using Tabu search algorithm A case study: ranking some countries of the west Asia and the North Africa based on important development criteria, J. Rezaeian, K. Shokoufi, S. Poursafari, Journal of Optimization in Industrial Engineering, In Press. (2014)

24. Performance evaluation of Mazandaran Water and Waste Water by data envelopment analysis and artificial neural network, J. Rezaeian, A. Asgarinezhad, Journal of Industrial Engineering, Vol. 2. 201-213, 2014.

25. Minimizing makespan for flow shop scheduling problem with intermediate buffers by using hybrid approach of artificial immune system, S. Abdollahpour, J. Rezaeian, Applied Soft Computing, In Press.

26. A genetic algorithm for capital budgeting problem with fuzzy parameters, H Rashidi-Bajgan, J Rezaeian, T Nehzati, N Ismail, Computer Applications and Industrial Electronics (ICCAIE), 2010 ...

27. An efficient hybrid genetic algorithm for multi server vehicle routing problem with multi entry, Hany Seidgar, Mehdi Abedi, Sahar Tadayoni Rad, Javad Rezaeian,  International Journal of Industrial and Systems Engineering, In Press (2014)

28.  Scheduling of multi- component products in a two–stage flexible flow shop, Nikzad, J. Rezaeian, Mahdavi, Rastegar, Applied Soft Computing, In Press.

29. Scheduling unrelated parallel machines with sequence dependent setup times, Mohammad Hosseini, J. Rezaeian, International Journal of Advanced Manufacturing Technology, In press.

30. Planning road networks in landslide-prone areas: A case study from the northern, Jaafari- Najafi – Rezaeian – Sattarian – Ghajar,  Land Use Policy, In press. 

 

31. Design of high performing hybrid meta-heuristics for unrelated parallel machine scheduling with machine eligibility and precedence constraints, Afzali Rad, Rezaeian, Engineering Optimization, In Press.

32. A robust hybrid approach based on particle swarm optimization and genetic algorithm to minimize the total machine load on unrelated parallel machines, Mir Saber Salehi Mir, J. Rezaeian, Applied Soft Computing, In Press.

33. Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time, Seyedeh Sarah Zabihzadeh, Javad Rezaeian, Applied Soft Computing, In Press.

34. Designing an Integrated Production/Distribution and inventory Planning Model of Fixed-life Perishable Products, Javad Rezaeian, keyvan Shokoufi, Sepideh Haghayegh, Iraj Mahdavi, Journal of Optimization in Industrial Engineering, 19 (2016) 47-59.

35. Two new meta-heuristics for no-wait flexible flow shop scheduling problem with capacitated machines, mixed make to order and make to stock policy, S. Abdollahpour, J. Rezaeian, Soft Computing, In Press.

36. Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions, M. Afzali-Rad, J. Rezaeian, Computers and Industrial Engineering, In Press.

37. Pre-emptive Just-in-time scheduling problem on uniform parallel machines with time-dependent learning effect and release dates, Keyvan Shokoufi , Javad Rezaeian, Iraj Mahdavi, Babak shirazi , International Journal of Operational Research, In Press.

38. Prediction of Surface Roughness by Hybrid Artificial Neural Network and Evolutionary Algorithms in End Milling, J. Rezaeian, A. Taheri, S. Haghaiegh, Iranian Journal of Mechanical Engineering, Vol 15, 2015.

39. An optimization model for multiple traveling salesman problem with balance workload Aims of salesman by using the genetic And Firefly algorithms, DAV INTERNATIONAL JOURNAL OF SCIENCE M. Mohammadi, J. Rezaeian, G. Rahmanifar,

40. Unrelated Parallel Machines Scheduling with the Effect of Aging and Learning under Multi Maintenance Activities, E. Ebrahimi, J. Rezaeian, Manufacturing Science and Technology 3(2): 25-31, 2015

41. A meta-heuristic for the school bus routing problem, V. Ghanbari, J. Rezaeian, I. Mahdavi, Journal of Transportation Engineering, In Press. 2016.

42. Two meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning, M.S Salehi Mir, J. Rezaeian,  International Journal of Industrial Engineering & Production Research. In Press. 2016.

43. Preemptive just-in-time scheduling problem on uniform parallel machines with time-dependent learning effect and release dates, Keyvan Shokoufi, Javad Rezaeian, Babak Shirazi and Iraj Mahdavi, International Journal of Operational Research, Inpress. 2016.

44. An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times, S. M. Mousavi, I. Mahdavi,  J. Rezaeian, M. Zandieh, Oper Res Int J, In Press. 2016.

45. Location-routing problem with multi-product cross-dock centers onsidering heterogeneous capacitated vehicles and split delivery and pickup in a multi-echelon supply chain, Elham Javanfar, Javad Rezaeian, Keyvan Shokoufi, Iraj Mahdavi, Journal of Transportation Engineering, In Press. 2016.

46. Pareto-based multi-criteria evolutionary algorithm approach for parallel machine scheduling problem with sequence-dependent setup times, M. Mousavi, I. Mahdavi, J. Rezaeian, M. Zandieh, scientia Iranica, 2016.

47. Decision making in best player selection: An integrated approach with AHP and Extended TOPSIS methods based on WeFA Freamwork in MAGDM problems, 1925-7805/    International Journal of Research in Industrial Engineering, B. Nikjou, J. Rezaeian, 2016.

 

48. Designing meta-heuristic algorithms for unrelated parallel machine scheduling with sequence dependent setup times, learning effects and machine eligibility, Danial Taghizadeh Cherati1, Javad Rezaiian, Journal of Engineering and Productivity, 2016.

49. An inventory model for non-instantaneous deterioration items in a two-echelon Supply chain, M. Akbarpour, J. Rezaeian, M. Akbarpour, Journal of Industrial Engineering Research in Production Systems , 2016.

50. Evaluation of Factors Affecting on Commercialization and Technology Transfer from University to Industry Using MCDM Approach (Case study: University of Science and Technology),  Yalda sadat Ahmadzadeh, Javad Rezaeian, Babak shirazi,  Journal of Engineering and Applied Sciences, October 2016.

51. 51. A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches, M. Afzali-Rad, J. Rezaeian, Applied Soft Computing, 2016.

52. EVALUATING CONTRACTORS USING FUZZY INFERENCE SYSTEMS, B. Moghtadai, Y.Gholipour_Kanani, J. Rezaeian, Journal of Fundamental and Applied Sciences, 15 February 2016.

53. Increasing Energy Productivity in Lean Production System with Energy Oriented Value -Stream Mapping, J. Rezaeian, I. Parvizi, I. Mahdavi, International Journal of Productivity and Quality Management, 2017.

54. Pareto-based multicriteria evolutionary algorithm approach for parallel machine scheduling problem with sequence- dependent setup times, J. Rezaeian, M. Zarei, K. Shokoufi, International Journal of Engineering: TRANSACTIONS C, December 2017.

55. Comparison among four calibrated meta-heuristic algorithms for solving a type-2 fuzzy cell formation on problem considering economic and environmental criteria, o. Arghish, R. Tavakkoli-MOghaddam, A. Shahandeh-Nookabadi, J. Rezaeian, Advances in Production Engineering & Management, Accepted, 2017.

56. Hybrid artificial immune system and simulated annealing algorithms for solving hybrid JIT flow shop with parallel batches and machine eligibility, J. Rezaeian, M. Shafipour, International Journal of Industrial Engineering and Production Research, September 2017.

57. Spatial Prediction of Slope Failures in Support of Forestry Operations Safety, A. Jaafari, J. Rezaeian, M. Shafipour, Croat. j. for. Eng, 2017.

58. The preemptive just-in-time scheduling problem in a flow shop scheduling system, J. Rezaeian, S. Hosseini-Kia, I. Mahdavi, Journal of Optimization in Industrial Engineering, 2018.

59. Providing a timetable for shifts of nurses with regard to job satisfaction: A case study in Imam Khomeini hospital in Noor city, S. Kavianpour, J. Rezaeian, Journal of Industrial and Management Systems, 2018.

60. Identification and Prioritization the Risks of Green Building Projects Based on the combination of FANP and FDEMATEL: (Case study: Savadkooh County), J. Ghobadi, J. Rezaeian, M. Haji-Aghaei, Amirkabir Journal of Civil Engineering 2018.

61. Scenario-based analysis of fast track strategy optimization on emergency department using integrated safety simulation, H. Hajjarsaraei, B. Shirazi, J. Rezaein, Safety Science, 2018.

62. Designing a two-dimensional mathematical model of the correct nonlinear mixed number with the aim of increasing the capability Ensuring the blood supply chain, Moetamedi, Movahedi, Rezaeian, Rashidi, Quality Engineering and Management, 2018.

63. An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes‏, J Rezaeian, Y Zarook‏, Journal of Optimization in Industrial Engineering, 2018.

 

64. Project risk evaluation by using a new fuzzy model based on Elena guideline‏, JT Pezhman Asadi, Javad Rezaeian,Toraj Mojibi‏, Journal of Civil Engineering and Management‏, 2018.

65. Vehicle Routing and scheduling problem for Necessary Commodities Distribution in Post-Disaster Humanitarian Relief Operations simultaneously‏, M Soleymani, Rezaeian‏, Journal Of Transportation Research‏, 2018.

 

 

66. Bi-objective Optimization Model for Integrated Preventive Maintenance and Flexible Job-shop Scheduling Problem, Rezaeian, Mohammadpour,  Computer Science and Information Technology , 2019.

67. Identification and Prioritization the Risks of Green Building Projects Based on the combination of FANP and FDEMATEL: (Case study: Savadkooh County), Amirkabir Journal of Civil Engineering , Javad Ghaobadi; Javad Rezaeian; Mostafa Haji Aghaei Keshteli , 2019.

68. The Preemptive Just-in-Time Scheduling Problem in a Flow Shop Scheduling System‏, IM Javad Rezaeian, Sadegh Hosseini-Kia‏, Journal of Optimization in Industrial Engineering‏, 2019.

68. Multi-objective optimization of schedule to meet the demand for electricity using renewable sources and conventional sources‏, N Khalilpour Tilami, J Rezaeian, I Mahdavi‏, Iranian Electric Industry Journal of Quality and Productivity, 2019.

69. Identification and Prioritization the Risks of Green Building Projects Based on the combination of FANP and FDEMATEL: (Case study: Savadkooh County), Amirkabir Journal of Civil Engineering , Javad Ghaobadi; Javad Rezaeian; Mostafa Haji Aghaei Keshteli , 2019.

70.  A multi-objective optimization model for multiple project scheduling and multi-skill human resource assignment problem based on learning and forgetting effect and activities' quality level, Milad Hematian, Mirmehdi Seyyedesfahani, Iraj Mahdavi, Nezam Mahdavi Amiri, Javad Rezaeian, Journal of Industrial Engineering and Management Studies, 2020.

71. Ranking the Success Factors to Improve Safety and Growth of Artichoke Medicinal Plant  Using Fuzzy Analytic Hierarchy Process, J Rezaeian, F Talebi, R Alizadeh Foroutan, Food Science and Engineering, 2020.

72. An exact solution approach using a novel concept for single machine preemptive scheduling problem in the just-in-time production system‏, K Shokoufi, J Rezaeian‏, Journal of Industrial and Production Engineering, 2020.

73. Multi-objective fuzzy programming model to design a sustainable supply chain network considering disruption‏, R Babagolzadeh, J Rezaeian, M Valipour Khatir‏, International Journal of Industrial Engineering & Production Research, 2020.

74. A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty‏, M Hematian, MM Seyyed Esfahani, I Mahdavi, N Mahdavi‐Amiri, Javad Rezaeian, Computational Intelligence, 2020.

75. A Genetic Algorithm for Designing an Integrated Cellular Manufacturing System Considering a Linear Double-Row Layout‏, P Sharifi, Nagahisarchoghaei, Nagahi, Jaradat, Mahdavi, Rezaian‏, INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH‏, 2020.

76. Factors Affecting Blood Donation in the Blood Supply Chain under Critical Conditions‏, ARK Majid Motamedi, Mohammad Mahdi Movahedi, Javad Rezaiian Zeidi‏, Journal of Police Medicine‏, 2020.

77. A modified genetic algorithm for non-emergency outpatient appointment scheduling with highly demanded medical services considering patient priorities‏, R Alizadeh, J Rezaeian, M Abedi, R Chiong‏, Computers & Industrial Engineering, 2020.

78. Scheduling parallel machine problem under general effects of deterioration and learning with past-sequence-dependent setup time: heuristic and meta-heuristic approaches‏, MSS Mir, J Rezaeian, H Mohamadian‏, Soft Computing, 2020.

79. Multi-objective optimization for green heterogeneous vehicle routing and scheduling problem with stochastic demand and supply‏, Y Zarook, Rezaeian, Mahdavi‏, Journal Of Transportation Research‏, 2019.

80. Single Machine Preemptive Scheduling by Hybridized Meta-Heuristic Approach, Javadian, N., Rezaeian, J., Khorshidian, H., Rahmani, K., Computer Applications and Industrial Electronics (ICCAIE), 2010.

81. Uniform Parallel Machines Scheduling with Setup Time, Learning Effect, Machine Idle Time, and Processing Set Restrictions to Minimize Earliness/Tardiness Costs, J.Rezaeian, K. Shokoufi, R.A Foroutan, Artificial Intelligence Evolution, 107-133

 

82. Designing a bi-objective decision support model for the disaster management, S Nayeri, E Asadi-Gangraj, S Emami, J Rezaeian, RAIRO-Operations Research 55 (6), 3399-3426

83. Determining the sequence and schedule of jobshop production systems using genetic algorithm by considering possible values, SA Shayan Nia, M Mohammadi, MR Lotfi, J Rezaeian, journal of Industrial Strategic Management

84. Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times. Y Zarook, J Rezaeian, I Mahdavi, M Yaghini, RAIRO--Operations Research 55 (3) .

85. Toward a scalable type-2 fuzzy model for resource-constrained project scheduling problem, A Mahdavi, B Shirazi, J Rezaeian, Applied Soft Computing 100, 106988.

86. Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints, RA Foroutan, J Rezaeian, M Shafipour, Journal of Industrial & Management Optimization.

87. Critical success factors for human resource management of construction project , S Leilaee, J Rezaeian , Journal of Project Management 6 (3), 121-132 .

88. Due Date Assignment and JIT Scheduling Problem in Blocking Hybrid Flow Shop Robotic Cells with Multiple Robots and Batch Delivery Cost‎, J Rezaeian, N Derakhshan, I Mahdavi, R Alizadeh Foroutan, International Journal of Industrial Mathematics 13 (2), 145-162.

89. Green vehicle routing and scheduling problem with heterogeneous fleet including reverse logistics in the form of collecting returned goods , RA Foroutan, J Rezaeian, I Mahdavi, Applied Soft Computing 94, 106462 .

90. Fuzzy Scheduling Problem on Unrelated Parallel Machine in JIT Production System, J Rezaeian, S Mohammad-Hosseini, S Zabihzadeh, K Shokoufi, Artificial Intelligence Evolution, 17-33.

91. Prioritizing and Analyzing Key Factors of Succeeding Knowledge-Based Organizations Using Analytical Hierarchy Process (AHP) , JR Somayeh Hosseinzadeh, Toraj Mojibi, Seyyed Mehdi Alvani, International Journal of Organizational Leadership .

 

 

Conference Papers:

1.     Designing a cellular manufacturing system with incremental cell formation, Mahdavi, I. Rezaeian, J., Rahimian, A., International Industrial Engineering Conference 13&14th July 2004, Tehran, Iran.

 

2.  Control of ordering systems using fuzzy logic, Rezaeian, J.,Mahdavi, I.,  Threerd International Workshop on Supply Chain Management and information Systems (SCIMS-2005), Greece.

 

 

3.     Multi-objective cellular manufacturing system under machines with different life-cycle using genetic algorithm, Javadian, N., Rezaeian, J., Maali, Y., Proceedings of World Academy of Science, Engineering and Technology, 24 October 2007.

 

4.  A mathematical model in dynamic system reconfiguration CMS with production planning, Javadian, N., Aghajani, A., Rezaeian, J., Kazemi, M., Second International Conference of Iranian Operations Research Society, May 20-22, 2009, Babolsar, Iran.

 

 

5.  Designing a dynamic cellular manufacturing model with considering alternative routing, back order and lot splitting, Aghajani, A., Kazemi, M., Rezaeian, J., 3rd International Conference of Iranian Operations Research Society, May 5-6, 2010, Tehran, Iran.

 

6.     Assignment of operation and machine to the workstations for a part families using Tabu search for incremental cell formation, Mahdavi, I., Rezaeian, J., Mittal. A. K.,  Fifth International Conference on Operation and Quantitative Management (ICOQM-V), October 2004, Hang Yang University, S. Korea.

 

 

7.     A Method to Find Common due Date in Flow Shop Scheduling, Mahdavi, I., Bagherpour, M., Rezaeian, J., Second AIMS International Conference on Management, 2004, Calcutta, India.

 

8.       Designing an Incremental Cellular Manufacturing System Based on Heuristic Methods, Rezaeian, J., Norouzi, A., Eizadi, H., 14th WSEAS International Conference on Computers, July 23-25, 2010, Corfu Island, Greece.

 

9.     Designing a two –layer supply chain with capital budgeting consideration, 3rd International Conference of Iranian Operations Research Society, Mohajeri, A., Rezaeian, J., May 5-6, 2010, Amir Kabir University of Tehran, Iran.

 

 

10.    The vehicle routing problem combined with manpower allocation, Kiyani, M., Seidgar, H., Mahdavi, I., Rezaeian, J., 5th International Conference of Iranian Operations Research Society May 16-17, 2012, Tabriz, Iran.

 

11.    Comparison of two Genetic Algorithms for the Unrelated Parallel Machine Scheduling Problem, Aghajani, M., Rezaeian, J., Mahdavi, I., 5th International Conference of Iranian Operations Research Society May 16-17, 2012, Tabriz, Iran.

 

12.    Applying ANP-PROMETHEE approach for selecting the best product for planting in gardening, Rezaeian, J., Barghandan, M., Jaafarzadeh Afshari, A., Rostami, M., International Conference on Nonlinear Modelling and Optimization, 28-29 Agust, 2012, Amol, Iran.

 

 

13.                            A Multi Depot Vehicle Routing Problem with Stochastic Demand, J. Rezaeian., Marjani, A.H., 6th International Conference of Iranian Operations Research Society May 8-9, 2013, Tehran, Iran.

14. Unrelated parallel machines scheduling with rework processes and machine eligibility restriction, Rambod, M., Rezaeian, J., 6th International Conference of Iranian Operations Research Society May 8-9, 2013.

15. A knowledge management framework for successful implementation of ERP systems, Ebrahimi, A., Rezaeian, J., Farhadianfard, K., 2nd International Conference on Industrial Engineering and Service Science, 20-22 August, 2013, Indonesia.

16. Efficiency evaluation of Mazandaran Industrial Parks by using Neuro-DEA approach, Sharifi, M., Rezaeian, J., Shirazi, B.,  The 5th National Conference on Data Envelopment Analysis September 4-6, 2013,  Tonekabon, Iran.

17. Bi-objective optimization model for integrated preventive maintenance and flexible job-shop scheduling problem, Atarodi, E., Rezaeian, J., Taheri, A., 2nd National Conference on Industrial Engineering & Systems, Islamic Azad University, Najafabad Branch, 25-26 February 2014.

18. A Genetic Algorithm for Capital Budgeting Problem with Fuzzy Parameters, Rashidi, H., Rezaeian, J., Nehzati, T., Ismail, N., 2010 International Conference on Computer Applications and Industrial Electronics (ICCAIE 2010), December 5-7, 2010, Kuala Lumpur, Malaysia.

19. Single Machine Preemptive Scheduling by Hybridized Meta-Heuristic Approach, Javadian, N., Rezaeian, J., Khorshidian, H., Rahmani, K., Computer Applications and Industrial Electronics (ICCAIE), 2010.

 

20. Spatial prediction of slope failure in the Caspian forest using an adaptive neuro-fuzzy inference system and GIS, Jaafari, A., Najafi, A., Rezaeian, J., Shafipour, M., 21-23 September, France.

 

 

 

 

Books:
    1. Economic Evaluation of projects, Comfar III education step by step, 2013.
    2. Metaheuristic Algorithms and their applications, step by step implementation by MATLAB, 2014.
    3. Multi-objective Algorithms and new meta-heuristics, 2016.
    4. Lessons From The World’s Strongest Brands: Sales and Marketing, LAP LAMBERT Academic Publishing, 2019.
    5. Solving The Customer Experience Puzzle: A Guidebook For Leaders, LAP LAMBERT Academic Publishing, 2020.
 
Supervised Dissertations and Theses

Number of PhD students: More than 10

Number of master students: More than 100

 
Research Projects
Go to top of page